3238 W CABOT DR 1Permit Types
BID ELE MEC FPLM
X
Permit Number: BLD2023-00008-
Issued: 01/03/2023
www.anaheim.net/building
(714)76514626
Quarter Section: 5
Site Address: 3238 W CABOT DR 1, ANAHEIM, CA 92804
Legal Description: N TR 5102 BLK LOT 9
APN:13530126
CITY OF ANAHEIM
Project Description: Mechanical change out furnace in closet
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765 -5153
Living Area: Number of Stories: 1 Valuation: 0.00
Garage Area: Construction Types: N/A
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinldered:
Cool Roof: Total Fees paid for Permit: 167.00
People Associated with Project:
Permit Applicant Matt ServicesSturms
Owner EDLER PAUL M TR 17220 NEWHOPE ST 224
Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Qty
Heating Appliances, Including vent 1
The permit shall expire by limitation and become null and void if the building or work has not passed Anal inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�pHEIM C.
Cityof Anaheim D� �O
Building Division F pZ
j >
�DG�►DED
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released'
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ne :
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unlasr sunned nffi
Sewer
Water Engineering Backflow (Testable Only)
Water Service