Loading...
3238 W CABOT DR 1Permit Types BID ELE MEC FPLM X Permit Number: BLD2023-00008- Issued: 01/03/2023 www.anaheim.net/building (714)76514626 Quarter Section: 5 Site Address: 3238 W CABOT DR 1, ANAHEIM, CA 92804 Legal Description: N TR 5102 BLK LOT 9 APN:13530126 CITY OF ANAHEIM Project Description: Mechanical change out furnace in closet BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 -5153 Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinldered: Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Permit Applicant Matt ServicesSturms Owner EDLER PAUL M TR 17220 NEWHOPE ST 224 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Qty Heating Appliances, Including vent 1 The permit shall expire by limitation and become null and void if the building or work has not passed Anal inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�pHEIM C. Cityof Anaheim D� �O Building Division F pZ j > �DG�►DED Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released' Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ne : Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unlasr sunned nffi Sewer Water Engineering Backflow (Testable Only) Water Service