Loading...
3554 W CHRISTINE CIRPermit Types BLD ELE MEC PLM X Permit Number: BLD2023-00056 Issued: 01/09/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 3 CITY OF ANAHEIM Site Address:.3554 W CHRISTINE CIR B, ANAHEIM, CA 92804 Legal Descriptlon: N TR 8204 BLK LOT 4 APN: 13439204 Project Description: Plumbing to change out water heater BUILDING DIVISION 200 S. ANAHEIM BLVD. 87141765.5153 Living Area: Number of Stories: t Valuation: 0.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 0.00 People Associated with Project: Owner JAI VIDHATA L P 12380 CARAVEL PL Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City Water Heater 1 The permit shall expire by limitation and become null and vold If the building or work has not passed Anal inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�P►1EIAq �qc Cityof Anaheim o� �o Building Division z u > ��G�►DED �$y^ Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final lu g Final — 3— Mec ranlca r1inaI Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbina Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless swoned off) Sewer Water Engineering Backflow (Testable Only) Water Service