Loading...
5810 E CAMINO MANZANOPermit Types BLD I ELE I MEC PLM n. Permh Number: BLD202342926 Issued: 06/13/2023 www.anaheim.neUbuilding (714)765.4626 Quarter Section: 185 CITY OF ANAHEIM Site Address: 5810 E CAMINO MAN2ANOAnaheim, CA 92807 Legal Description: N TR 16254 BLK LOT 69 APN:35833134 Project Description: Residential EV Charger Level 2 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Living Area: Number of Stories: Valuation: 0.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spdnldered: Cool Roof: Total Fees paid for Permit: 0.00 People Associated with Project: Contractor BEAR STATE ELECTRIC 1736 EAST AVE R4 PALMDALE, CA Permit Applicant EDWARD TORRES Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. �PHEIM cq Cityof Anaheim D� P leo Building Division i u a DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will beset within 2-3 business days after approval) Excludes New Constructoon Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service