Loading...
5958 E CAMINO MANZANO (3)Permit Types BLD ELE MEC PLM X X X Permit Number: BLD2018-05199 Issued: 11/19/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 190 Site Address: 5958 E CAMINO MANZANO Legal Description: N TR 7419 LOT 142 CI 200 SiANAHEIMSLVD. (714) 765 - 5153 EIM Project Description: Residential Remodel: Replace 100 sq ft of drywall with plumbing and electrical for kitchen remodel. Valuation: $3,500.00 Construcion Types: N/A,. , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 364.50 People Associated with Project: Owner KENT RATZLAFF TR 5958 E CAMINO MANZANO ANAHEIM CA 92807-3215 Contractor EVERGREEN CONSTRUCTION GROUP INC 5501 NEWCASTLE AVE 224 ENCINO CA 91316 0000 Permit Applicant MAYAN SNIR Type Electrical Fixtures Qty Type Receptacle, switches, lights 12 Kitchen Sink Garbage Disposal Dishwasher Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit combo • City of Anaheim P�PNEIM �.q< o� io Building Division F i ueo �$y� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPEC i6R All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Y Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub ListfBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) I Z Q COA/Migation Measures Do not install subfloor or pour floor slab until the follwing appli6abld items have been s' Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit)_ Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGlyders)- Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) IEEE 2nd.Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been e. 1st Floor Shear l Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical ) I°1 12.6 Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec 8 Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Cnnstructinn Exterior Plaster (Brown Coat) T -Bar (Strutt., Ele., or Mec.) Grease Interceptor (Do not backfill un as& ginned offi Sewer Water Engineering Backflow (Testable Only) Water Service