Loading...
6421 N CORNET CIR (5)061int Pyr CITY OF ANAHEIM BUILDING DIVISION Permit Number: BLD2022-05749 200 S. ANAHEIM BLVD. Issued: 12/06/2022 (714)765.5153 www.anaheim.net/building i (714)765-0626 Quarter Section: 171 Site Address: 6421 N CORNET CIR, ANAHEIM, CA 92807 Legal Description: N TR 4926 BLK LOT 34 APN: 34302324 Project Description: Residential Photovoltaic System with Microinverters Living Area: Number of Stories: - Valuation: 16,160.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 260.10 jPeople Associated with Project: Permit Applicant SunPower Systems Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Microinverter 19 Sub Panel/temp Pwr - Under 600 V, up to 1 200 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHElm C9C Cityof Anaheim D� io Building Division U > �DVNDED day^ Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPEM All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been inne Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sionedo 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unW&UinnPtj nfn Sewer Water Engineering Backflow (Testable Only) Water Service