Loading...
1717 S DISNEYLAND DR (94)Permit Types �11LD ELE MEC PLM X Permit Number: Issued: 03/16/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 66 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 745-5153 Site Address: 1717 S DISNEYLAND DR, ANAHEIM, CA 92802 Legal Description: N TR 2854 BLK•LOT 1 TRACT NO 2854 LOT 1 POR OF LOT APN: 12944117 Project Description: Storage Racks: 76 In. ft. x 10 ft. high storage racks. Living Area: Number of Stories: 0 Valuation: 60,000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Dock Area: Fire Sprinklered: No Cool Roof: Total Fees paid for Permit: 879.75 People Associated with Project: Permit Applicant Amanda Liske 700 W Bell Rd Anaheim, CA 92868 Owner P C & RS CHAO FAMILY LTD PARTNERSHIP PO BOX 5046 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and vold If the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PHElm �.qt Cityof Anaheim D� io Building Division F i u > �DUNDED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSP&,,rOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 766.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sionedo Building Final (714 765-5153) Last Inspection -Final Only After Above Completed. Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been smaned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mecbanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Strutt., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service vA