570 S EVENINGSONG LN (2)Permit Types
BLD' I ELE I MEC PLM
X X
Pormit'Numbtar:13LD2023-02803
Issued: 06/09/2023
www.anaheim.neUbuilding
(714)765-0626
Quarter Section: 225
CITY OF ANAHEIM
Site Address: 570 S EVENINGSONG LN, ANAHEIM, CA 92808
Legal Description: N TR 12989 BLK LOT 55
APN:35424222
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Residential Photovoltaic System with Microinverters
Living Area: Number of Stories: Valuation: 26,000.00
Garage Area: Construction Types:
carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spdnldered:
Cool Roof: Total Fees paid for Permit: 167.00
People Associated with Project:
Contractor UNDERLINE ENERGY CONCEPTS 18540 PASADENA ST STE A201612050959345297 LAKE ELSINORE, CA 92530
Permit Applicant Jennifer Kemme
Type Electrical Fixtures City Type Plumbing Fixtures ally Mechanical Fixtures Qty
Microinverter 26
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�pHEIM C9C
City of Anaheim O� io
Building Division
u >
��UNDED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilitiggs are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianedo
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildina Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been e
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Constructoon
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
(Do not back innPri nfn
Sewer
Water Engineering Backflow (Testable Only)
Water Service