Loading...
745 N EAST STPenn# -Types BLD ELE MEC PLM X Permit Number: BLD2022.04951 Issued: 10/18/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 92 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 7,45 N EAST ST 100; ANAHEIM, CA 92805 Legal, Description:,,N:TR :13916 BL'K LOT 1 LIN 1 TRACT 13916, LOT 1 OF PR APN93014461 Project Description: Plumbing to install (1) new water softener located outside in private yard. Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Dock Area: Fire Sprinldered: Cool Roof: Total Fees paid for Permit: 213.00 People Associated with Project: Permit Applicant Diane Aguilar Owner BROWN LARRY C 745 N EAST ST 100 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Water Softener 1 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PHEIM Cqc Cityof Anaheim D� io Building Division F i U > • `�DV�►DED V6 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE- INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electr'Ei lumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been i e • lot Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) ' Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbinq Inspections - Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service