1931 N ELDER GLEN CIR (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2022-04646
Issued: 09/30/2022
www.anaheim.net/building
(714)7654626
Quarter Section: 177
CITY OF ANAHEIM
Site, Address:. 1931 N ELDER GLEN CIR, ANAHEIM, CA 92807
Legaf Descriptfik N TR 4693 BLK LOT 47
APN:34324151
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765.5153
Project Description: Mechanical: Change out air condenser, (1) coil, furnace and (7) ducts.
Living Area: Number of Stories: t Valuation: 0.00
Garage Area: Construction Types: N/A
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spdnldered:
Cool Roof: Total Fees paid for Permit: 397.00
People Associated with Project:
Permit Applicant Emalee Joseph
Owner VUKELISH SHERI 1931 N ELDER GLEN CIR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Evaporative or Air Cooled Condenser 1
Heating Appliances, Including vent 1
Heating/Cooling Coil 1
Residential Registers 7
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
City of Anaheim
FINAL INSPECTIONS
items below must be
0.s- 4
DATE IINSPECTOR
before utilities are released
Irswaing ulvlslon Aix r2 Final Gas Test
U a Electrical Final
Plumbing Final
DED �a�^ echanical Final
Cross Connection Control (714) 765-4280
Do not occuov this building until the final inspections have been made. Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler, (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed7
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service