Loading...
1873-1875 W FALMOUTH AVEPermit Types BLD ELE MEC PLM X Permit Number. BLD2023-02920 Issued: 06/12/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 37 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765 -5153 Site Address: 1873-1875 W FALMOUTH AVE, ANAHEIM, CA 92801 Legal Description: N TR 11740 BLK LOT 3 UN 47 TR 11740 LOT 3 UNIT 47 APN:93072262 Project Description: Re -root: tear -off existing and Install (10) sq. of BUR on (2) attached garages for address 1873 and 1875 W. Falmouth Ave. Living Area: Number of Stories: 2 Valuation: 6,800.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 338.88 People Associated with Project: Contractor GRAND PACIFIC ROOFING CO INC 8766 SAN FABIO CIRABCDE11137364 BUENA PARK, CA 90620 Permit Applicant Mike Melvin Owner MAI, VAN QUI 1873 W FALMOUTH AVE 47 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed Anal Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim I FINAL INSPECTIONS I DATE I INSPECTOR I I All applicable items below must be signed before utilities are released I auffalflg ufvfSfvn F 2 J a �DDNDED �$y^ Do not occupy this building until the final inspections have been made. Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 76514591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned:�guild�ingFlnal714 Plumbing (Ground/Underfloor Water) 765-5153)zom snal Only Ager Abov��tf J Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) PARTIAL INSPECTIONS Buildinq Inspections Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not.cover or conceal the -work below until the following applicable items have been sianeds 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Flo Mechanical Inspections o heathi iaphragmlFram Masonry (Reint/Bond BeamlPre-Grout Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Pllig., Ele., Mec. & Fire) Plumbing Inspections Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Pibg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service