5925 E FIRENZE CRESCENTPermit Types
BLD ELE MEC PLM CITY OF ANAHEIM
X
BUILDING DIVISION
Permit Number: BLD2023-02996 200 S. ANAHEIM BLVD.
Issued: 06/15/2023 (714) 765 - 5153 lei
www.anaheim.neUbuilding
(714)765-4626
!7
Quarter Section: 191
Site Address: 5925 E FIRENZE CRESCENTAnaheim, CA 92807
Legal Description: N TR 6303 BLK LOT 15
APN:36301131
Project Description: Reroof: Remove existing to install (26) sq of composition shingles over entire house and attached garage
Living Area: Number of Stories: 0 Valuation: 8,000.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Coot Roof: Total Fees paid for Permit: 340.04
People Associated with Project:
Contractor KING ROOF REMOVAL INC 1638 E 4TH STREET SANTA ANA, CA
Owner PIGUEE, KENNETH RUSSELL & ALYSON ANN 5925 E FIRENZE CRES
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty
fi
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�pHEIM Cq<
City of Anaheim o� �o
Building Division F z
u >
DED
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signedi
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sffianed7
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Flo
S g iaphragm/Frame) ILTLJ
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections .
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mac.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service