Loading...
8855 E FOXHOLLOW DRPermit Types BLD ELE MEC PLM X Permit Number: OLD2023-02587 Issued: 05/25/2023 www.anaheim.neUbuilding (714)765-0626 Quarter Section: 232 CITY OF ANAHEIM Site Address: 8855 E FOXHOLLOW DR, Anaheim, CA 92808 Legal Description: N TR 15124 BLK LOT 13 APN: 51409113 Project Description: Residential EV Charger BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765-5153 Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony i Deck Area: Fire Spdnldered: Cool Root Total Fees paid for Permit: 167.00 People Associated with Project: Contractor CHEYENNE ELECTRICAL SERVICES 3411 SUNNYSIDE DR RIVERSIDE, CA Permit Applicant Eric Khatib Owner NEIL, MARTIN TR 8855 E FOXHOLLOW OR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. City of Anaheim Building Division Do not occupy this buildina until the final inspections have been made. INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been si ed: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane ReinE) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sionedo 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 611121 Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765.4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COAIMigation Measures . Building Final (714 765-5153) Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections