138 S GILBERT ST (3)Permit Types (/
ee1�
BLD ELE MECr-X-
LM �0 �'pc4
1���
X X X of .r o
i
Permit Number: BLD2016-00517
Issued: 03/23/2016 CITiYrOfA _A3HEIM
INSPECTION REQUEST LINE: `` "- ?-/ it
BUIL "ING�DI1 §t t
(714) 765 - 4626 �«q���'q �y '
200 S. 4) 76 EIM�53D.
Quarter Section: 33 (714) 765 - 5153
Site Address: 138 S GILBERT ST
Legal Description: P BK 115 PG 40 PAR 6
Project Description: Residential Remodel: 452 sq. ft. interior remodel to create bedroom #5 with W.I.C, bathroom #4 to
existing laundry room with infill of door opening, and new bathrooms #5 & 6. Install 18 retro -fit windows (like for like). 45 sq. ft. to
create bathroom in existing workshop. REF: INV2015-00623
Valuation:
$15,000.00
Construcion Types:
VB, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
3,211.05
People Associated with Project:
Engineer HUE C LIU 10732 LA BATISTA AVENUE FOUNTAIN VALLEY CA 92708
Permit Applicant ; . DENNIS RUEBSAMEN ~ .
Type Electrical Fixtures ti rt my Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Sub Panelfremp Pwr < 600 V; 0 <, amps 1.tiBath Tub 1 Ventilation Fan - <= 300 cfm on single duct 3
<= 200 'L'a`vatory 3
Receptacle, switches, lights 26 Water Closet 3
�% I .°t 1 � ��`r - Repair/Drainage Alteration/Vent Piping 1
• -' ` ' Wafer Distribution 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbid_permit_combo
P�PHEIM Cq<
City of Anaheim °� �o
Building Division F i
u '
NnEo �sy^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
CONMigatlon Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Ins esti R I T EXPIRED
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Jolst/Glyders)
iiIPE
C T! 0
N
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been si ed:
DATE' —
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out) �a J
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
0 not backfill unless sianed ofn
Sewer
Water Engineering Backflow (Testable Only)
Water Service