Loading...
225 W GOLDEN WEST AVEPermit Types BLD ELE MEC PLM X Permit Number: BLD2018-03027 Issued: 07/12/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 36 Site Address: 2255 W GOLDEN WEST AVE Legal Description: N TR 2773 LOT 34 CITWOEANAHEIM 200 WANAHEIMSL (714) 765 - 5153 Project Description: Reroof: Remove existing material, resheath as needed and install 26 squares of composition shingles onto house and attached garage. Valuation: $10,000.00 Construcion Types: NIA, , Fire Sprinklered? No Total Fees paid for Permit: 280.76 People Associated with Project: Owner GERSAIL WONG 2255 W GOLDEN WEST AVE ANAHEIM CA 92804-6427 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been s' ned: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have e s*aned7 1st Floor Shear Firesprinkier (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Qnstructmon Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hackfill unless sinnpd off) Sewer Water Engineering Backflow, (Testable Only) Water Service FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765.4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed -7 Z / PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections