1963 W GREENLEAF AVE (12)Permit Types
BLD ELE MECPLM
X
Permit Number: BLD2018-01668
Issued: 04/19/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 38
Site Address: 1963 W GREENLEAF AVE G
Leg al`Description:
200 SMAIVAHEIM,-BL
(714) 765 - 5153
EIM
Project Description: Residential Remodel: Install (9) retro -fit windows and (1) sliding door. Work done prior to permit
REF:INV2018-00117.
Valuation: $5,000.00
Construcion Types: WA, ,
Fire Sprinklered? No
Cool Roof No
Total Fees paid for Permit: 212.33
People Associated with Project:
Owner ALAN MCCOMBS 1963 W GREENLEAF AVE #G ANAHEIM CA 92801
Permit Applicant ALAN MCCOMBS 1963 W GREENLEAF #G ANAHEIM CA
Type
Electrical Fixtures
Qty Type
Plumbing Fixtures
Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
EXPIRED
INSPECTION
NOT COMPLETED
DATE: I I UI
/ P�p,HEIM C
Cityof Anaheim o4 �o
Building Division A i
U D
SOUNDED �ah�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
s' e •
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre4lab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sffiane&
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinE/Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical °
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy) •� "' G i (a .0 = I;A
Do not tape or plaster until the following applicable items have been si •� 1.
t.w 1 1 J i •,&�:
Drywall V
%.J )
Drywall Penetrations (Ele, Mec & Plbg) 11 j
4 11-
110 t 1
i li it i
Interior Lath
Exterior Lath
1
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3"
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not hackfill unless senned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service