2553 W GLENOAKS AVE (3)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2023-00572 t9E'
Issued: 02/02/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 25
CITY OF ANAHEIM
Site Address: 2553 W GLENOAKS AVE, ANAHEIM, CA 92801
Legal:bescriptlon: N.TR 1948 BILK LOT 75
APN: 07-127521
Project Description: Mechanical to change out wall heater
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765-5153
Living Area: Number of Stories: 0 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spdnklered: No
Cool Roof: Total Fees paid for Permit: 167.00
People Associated with Project:
Contractor FRINJ ENERGY -HEATING & AIR CONDITI 971 WINSTON CIRCLE CORONA, CA
Permit Applicant Thomas Collins
Owner WILLIAMS JOHN A TR 2553 W GLENOAKS
Type Electrical Fixtures Qty Type Plumbing Fixtures Gly' Mechanical Fixtures Qty
Heating Appliances, Including vent 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�PNeIM Cq< FINAL INSPECTIONS DATE INSPECTOR
City of Anaheim O� All applicable items below must be signed before utilities are released
Dulloing UIv151on F y Final Gas Test
> Electrical Final
Plumbing Final
neo �$h^ ei:hanical Final _ r 62
Cross Connection Control (714) 7654280
Do not occupy this building until the final inspections have been made. Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed7
BCildl:ng �Fina)1714 765-5153)
Lenal 0 ly After Above Compl e
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s4ane&
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough uct (Mechanical) JF A
ough Mechanical
ougn ectrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service