2560 W GLENOAKS AVE (3)Permit Types
BLD ELE MEC PLM
X X
Permit Number: BLD2023-02151
Issued: 05/24/2023
www.anaheim.net/building
(714)765-0626
Quarter Section: 25
CITY OF ANAHEIM
Site Address: 2560 W GLENOAKS AVE, Anaheim, CA 92801
Legtil Descrtption: N TR 1948 BLL LOT 70
APN:07128302
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765.5153
Project Description: Photovoltaic System: Installation of residential roof mounted system with (9) modules and (1) inverter
Living Area: Number of Stories: 1 Valuation: 16,000.00
Garage Area: Consbucdon Types: VB
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered: No
Cool Roof: Total Fees paid for Permit: 611.34
People Associated with Project:
Contractor SOLCIUS LLC 1555 NORTH FREEDOM BLVD201612211122149732 PROVO, UT 92503
Owner JUNIO. ALFREDO N & ROSA G 2560 W GLENOAKS AVE
Engineer - Civil Arlo Edward Hulick 7114 Stili Haven Dr Richmond, TX 77407
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures City
Inverter 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�PNEIM Cq<
Cityof Anaheim D� �o
Building Division F y
a
�DU�►DED
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
z( /u
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sbaned ofn
Sewer
Water Engineering Backflow (Testable Only)
Water Service