3052 W GLEN HOLLY DR (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2018-00935
Issued,: 03/06/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
.,a C
200SM-ANAHEWBLVD.
Quarter Section: 10 (714) 765 - 5153
Site Address: 3052 W GLEN, HOLLY DR
Lega D s-nption:�N;TR.3823 LOT 13
EIM
Project Description: Reroof: Install 28 squares of GAF composition shingles over existing one layer of house and attached
garage.
Valuation:
$4,315.00
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
280.02
People Associated with Project:
Owner KENNETH GLENN DRIFTMIER 22908 ELK GRASS ST CORONA CA 92883-7685
Permit Applicant KEN DRIFTMIER
Type Electrical Fixtures Qty, ,Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation andiicome null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to'commence or continue work. ibld_permit_combo
t ' •� i�
P�PNEIM �qc
Cityof Anaheim D� io
Building Division y
u >
�OGNDEO
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
s' ned:
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Atj
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
ee s'
DATE:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service