3156 W GLEN HOLLY DRPermit Types
BLD ELE MEC PLM
X
Permit Number: OLD2023-01267
Issued: 03/16/2023 '
www.anaheim.net/building
(714)765.4626
Quarter Section: 10
CITY OF ANAHEIM
Site Address:.3156 W GLEN HOLLY DR, ANAHEIM, CA 92804
Legal Description: N TR 4679 BLK-LOT 7
APN:07988207
BUILDING DIVISION
200 S. ANAHEIM BLVD.
1714) 765.5153
Project Description: Plumbing to install two-way sewer cleanout in front yard and for re -drain
Living Area: Number of Stories: 1 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permh: 276.00
People Associated with Project:
Contractor ROOTER HERO PLUMBING 11150 SEPULVEDA BLVD STE 2A201804181246247567 MISSION HILLS, CA 92805
Permit Applicant Luminitsa Cercel
Owner DAVIN A LENORA 3156 W GLEN HOLLY DR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Repair/Drainage AtterationNent Piping 1
Sewer per 100 ft. "s 1
The permit shall expire by limitation and become null and vold if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PNEIM Cq<
City of Anaheim o� io
Building Division F i
U >
�D�NDED
Do not occupy this buildino until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electric I Final 1
lumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAT ' tion Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
wilding Final (71 765-5153)
astInspectlon-F
LOnly After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbina Ins ections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Constructinn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service