Loading...
164 S HARBOR BLVDPermit Types BLD ELE. MEC PLM X Permit Number. BLD202342771 Issued: 06/26/2023 www.anaheim.neUbuilding (714)765=4626 Quarter Section: 72 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 164 S HARBOR BLVD, Anaheim, CA 92805 Legal Description: N TR 16606 BLK LOT 1 UN 113 TRACT 16606, LOT 1 OF APN: 93823323 Project Description: EV Charger: Installation of (1) private Level 2 EV Charger in shared parking garage Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony/ Deck Area: _ Fire Sprinklered: No Cool Roof: Total Fees paid for Permit: 604.00 People Associated with Project: Contractor CALIFORNIA ELECTRICAL SERVICES 5924 SAN FERNANDO ROAD200409131333535260 GLENDALE, CA 91202 Permit Applicant Karol Unilowski Owner ROBINSON DANIEL MICHAEL 8 SHELBY ALIS 164 S HARBOR BLVD UN #113 Engineer - Electrical JERZY TARLOWSKI MISSION HILLS, CA 91345 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qly EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�pHEIM cq< City of Anaheim o� io Building Division F i u > `ahq mO�NDED Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765.5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Mane. Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been e• 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service