900 S HARBOR BLVD (11)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2017-01976
Issued: 05/15/2017
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter'Section: 85
Site Address: 900 S HARBOR BLVD
Legal Description:
Project Description: Electrical for tenant improvement
CI
200 W --A AHE1M L
(714) 765 - 5153
EIM
Valuation:
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
148.14
People Associated with Project:
Contractor HI-TEK ELECON INC 13321 ALONDRA BLVD E SANTA FE SPINGS CA 90670 0000
Permit Applicant SANG KIL KIM
Type Electrical Fixtures
Receptacle, switches, lights
Qty Type Plumbing Fixtures Qty Type
98
Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
City. of Anaheim PSP"ESM cq(
O� !co
Bilding Division Z`
n
'
NDeo
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released.
Final Gas Test
Electrical Final `7
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION
DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing
applicable items have been
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girder°s)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned7
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
r
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construrflon
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service