Loading...
1224 N HINSDALE PLPermit Types BLD ELE MEC PLM X Permit Number: BLD2023-01730 Issued: 04/13/2023 www.anaheim.neUbuiiding (714)7654626 Quarter Section: 190 Site Address: 1224 N HINSDALE PL, ANAHEIM, CA 92807 Legal Description: N TR 7449 BLK LOT 61 APN:34942202 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 705.5153 Project Description: Residential Remodel: To replace (5) retrofit windows and (1) patio door Living Area: Number of Stories: 1 Valuation: 8,379.35 Garage Area: Construction Types: WA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinldered: Cool Roof. Total Fees paid for Permit: 174.09 People Associated with Project: Contractor HOME DEPOT USA INC DBA THE HOME DEPO P O BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA, GA 9280 Permit Applicant Kevin Boyle Owner BRUNS CYNTHIA L 4409 HARBOR RIDGE RD Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by [Imitation and become null and void if the building or work has not passed final Inspection 385 days from the date of permit Issuance. A new permit is required to commence or continue work. P�pHEl1W �qC FINAL INSPECTIONS DATE INSPECTOR Cityof Anaheim o� All applicable items below must be signed before utilities are released Building Division i Final Gas Test u > Electrical Final Plumbing Final �opNOEo Mechanical Final Cross Connection Control (714) 765-4280 Do not occupy this building until the final inspections have been made. Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migat ion Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si d: ding Final 4 765-51 n�S Plumbing (Ground/Underfloor Water) Las nspection-Final Only After Above ompte Underfloor Rough Gas I �a 10 0M f2 -- Mechanical (Groundwork) PARTIAL INSPECTIONS Electrical (Underground Conduit) Building Inspections r IAS -1 to Pre -slab (Compaction/Membrane Reinf.) (7 a Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Pibg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor fill unless smaned off) Sewer Water Engineering Backflow (Testable Only) Water Service