Permit Number: BLD2018-01049
Issued: 04/13/2018
CI
INSPECTION REQUEST LINE: " fMd.Ik """"ly, 'Al
BUIL-DING�DIV�ISIO
(714) 765 - 4626 200 'S§ VD.
Quarter Section: 75 (714) 765 - 5153
Site Address:- S HARBOR BLVD 6901 (Gadgets Go Coaster)
Legal -Descfiption:
EIM
Project Description: Disney - Mickey's Toontown / Gadgets Go Coaster - Berm Stairs - Tenant Improvement: Installation of
new stairs located on existing berm.
Valuation:
$80,000.00
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
1,874.81
People Associated with Project:
Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91
Engineer RICHARD NORA 1313 S. HARBOR ANAHEIM CA 92802
Engineer GATES BROWNE 1313 HARBOR ANAHEIM CA
Permit Applicant STEPHEN MANAMON s 1313 S. HARBOR BLVD ANAHEIM CA 92802
Type Electrical Fixtures '� 4 Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty,
3i f
The permit shall expire by limitation and become, and void if the building or work has not passed final inspection 365 days from the date of
—
permit issuance. A new permit is required to'commence or continue work. fbld_permit_combo
P� EI Oq`
City of Anaheim P""'
O� io
Building Division F i
>
�OUNDEO
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION DATE1 INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings) V7
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items ave been
sinned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
0
Z�
Por
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
PER144A
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.) t
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
vJIVIrLL LE[)
Do not cover or conceal the work below until the following applicable items have
been s'
D
1st Floor Shear
-
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinE/Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Constructoon
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service