Loading...
1313 S HARBOR BLVD (408)Permit Types BLD ELE MEC PLM X Permit Number: BLD2016-05556 Issued: 12/14/2016 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 75 Site Address: 1313,S HARBOR BLVD 2501 (Indy Jones Adventure) Legal Description: CI 200 SCAN HEIM�BLVD. (714) 765 - 5153 EIM Project Description: Disneyland - Adventureland - Indiana Jones - Tenant Improvement: Enclose existing door and relocated to new location, framing and drywall to interior non-bearing wall. Valuation: $60,000.00 Construcion Types: IIB, , Fire Sprinklered? Yes Total Fees paid for Permit: 1,035.17 People Associated with Project: Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91 Engineer RICHARD NORA 1313 S. HARBOR ANAHEIM CA 92802 Permit Applicant STEVE FLENTJE Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty �l •J lJ �t +✓ /1I I The permit shall expire by limitationland become, null and void if the building or work has not passed final inspection 365 days from the date of rkrie. k ea„ permit issuance. ,A'new permit islrequued to commence or continue work. fbld_permit_combo �PHE1M �q City of Anaheim O� P <�O Building Division F y U D SOUNDED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 76511280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 76514591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Building Final (714765-5153) Last Inspection-Final Only After Above Completed -L106 J ,PI I ` �S Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS BuIldina Ins a tions Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been si ned: 1st Floor Shear Mechanical Inspections Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sooned off) Sewer Water Engineering Backflow (Testable Only) Water Service