Permit Number: BLD2022-06019
Issued: 12120/2022
www.anaheim.neUbuilding
(714)765-0626
Quarter Section: 76
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765-5153
Site Address: 1313 S HARBOR BLVD 8600, Anaheim, CA 92802
Legal Description: S TWP 4 RGE 10 SEC 22 T 4 R 10 SEC 22 POR OF SEC A
APN: 08219019
Project Description: Electrical for DLR - SW Launch Bay - Adding (315) receptacles in Exhibition Space REF:BLD2022-03317
Living Area: Number of Stories: 1 Valuation: 0.00
Garage Area: Construction Types: N/A
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spdnldered:
Cool Roof: Total Fees paid for Permit: 338.00
People Associated with Project:
Owner WALT DISNEY WORLD CO PO BOX 5046
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Receptacle, switches, lights 315
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PHEIM Cq<
City of Anaheim o4 io
Building Division F i
u >
�DG�►DED �
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianedo
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame) .
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinct Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
�N
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
SII
r
SALASO'BRIEN
expect a difference
8825 Res�»rch Orivr_
lrvin�, C.n 926"18
911.9.753.'1553 I www.s�l� sobricn.co n-�
Complete Acceptance Letter
ELECTRICAL
Date of Report: 2023/04/12 Site Visit 2023/03/10
Date: 2023/03/16
To: Thomas Lee Name of Tomorrowland
DLR Project: DVC Lounge
SOBE Project:
#2022-01010
To Whom It May Concern,
To the best of our knowledge and belief, based on limited observation, the observed construction
generally meets the requirements set forth in the permitted plans and specifications. Since the
observations were not performed on a full-time bases, there may be non-compliant items that
were not readily observable and cannot be attested. Electrical Scope of Work shown as follows:
• Expand existing Men's restroom to add lighting fixtures and plumbing hardware sensors.
• Add new Women's restroom with new lighting and plumbing hardware sensors.
• Add new beverage center with casework with power for two coffee machines and two
soda dispensers.
• Add power for news water heater and for two new ceiling fans for the beverage center.
• Add CO2 Alarm System and CO2 System conduit to tanks.
• Add lighting fixtures and receptacle to plumbing chase.
• Reconnect power to new rooftop exhaust fan.
• Add new lighting fixtures connected via dimming system throughout the Lounge space.
• Provide Power and lighting fixtures with dimming control in the new Decision and
Meeting Rooms and LED Drapes.
• Add telephone/data Communication Systems outlets throughout the space.
• Add Audio System speakers and controls throughout the lounge.
• Adjusted controls for existing working lighting fixtures.
To the best of our knowledge, based on limited observation, at the previous site walk date
03/10/23 it was noticed:
• First floor lighting wall -wash fixture not installed. Q�oFi:ssioro
• First Floor rei�►ote-CQLO
tem audibles. o q
By:
Ro L. Lopez,
Electrical EOR
No. 13442
09/30/24
04�12�2023