Loading...
1313 S HARBOR BLVD (427)Permit Types BLD ELE MEC PLM X Permit Number: OLD2022-05905 Issued: 12/14/2022 www.anaheirnmet/building (714)765-4626', Quarter Section: 76 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765-5153 Site Address: 1313 S HARBOR BLVD 8600, Anaheim, CA 92802 Legal Description: S TWP 4 RGE 10 SEC 22 T 4 R 10 SEC 22 POR OF SEC A APN:0*8219019 Project Description: Plumbing to support DLR - SW Launch Bay - Change of Use Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof. Total Fees paid for Permit: 1,307.00 People Associated with Project: Permit Applicant Tyler Truong Owner WALT DISNEY WORLD CO PO BOX 5046 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty 'Bar Sink 1 Floor Drain 4 Floor Sink 1 Gas System (additlonal'outlets) 2 Gas System (outlets) 1 Kitchen Sink 2 Lavatory 3 Lawn Sprinklers (valves) 6 Miscellaneous Fixture 1 Repair/Drainage Aiteration/Vent Piping 1 Urinal 1 Water Closet 4 Water Distribution 1 Water Heater 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or -pour floor slab until the follwing applicable items have been sinned: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sionede 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final(714)766-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Electrical Inspections