1313 S HARBOR BLVD (427)Permit Types
BLD ELE MEC PLM
X
Permit Number: OLD2022-05905
Issued: 12/14/2022
www.anaheirnmet/building
(714)765-4626',
Quarter Section: 76
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765-5153
Site Address: 1313 S HARBOR BLVD 8600, Anaheim, CA 92802
Legal Description: S TWP 4 RGE 10 SEC 22 T 4 R 10 SEC 22 POR OF SEC A
APN:0*8219019
Project Description: Plumbing to support DLR - SW Launch Bay - Change of Use
Living Area:
Number of Stories:
0 Valuation: 0.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof.
Total Fees paid for Permit: 1,307.00
People Associated with Project:
Permit Applicant Tyler Truong
Owner WALT DISNEY WORLD CO
PO BOX 5046
Type Electrical Fixtures Qty
Type Plumbing Fixtures
Qty Mechanical Fixtures Qty
'Bar Sink
1
Floor Drain
4
Floor Sink
1
Gas System (additlonal'outlets)
2
Gas System (outlets)
1
Kitchen Sink
2
Lavatory
3
Lawn Sprinklers (valves)
6
Miscellaneous Fixture
1
Repair/Drainage Aiteration/Vent Piping
1
Urinal
1
Water Closet
4
Water Distribution
1
Water Heater
1
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION I DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or -pour floor slab until the follwing applicable items have been
sinned:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sionede
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mee.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service
FINAL INSPECTIONS I DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final(714)766-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Electrical Inspections