1313 S HARBOR BLVD (452)Permit Types
BLD ELE MEC PLM
X
`Permit Number: BLD2016-00752
Issued: 02/16/2016
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 75
Site Address: 1313 S HARBOR BLVD
Legal Description:
C
200 Si i4HEl BLVD.
(714) 765 - 5153
EIM
Project Description: Demolition of 1,195 sq.ft Building # 9038 "Paint Supply Shop". REF:BLD2015-06770.
Number of Stories 1 Valuation:
People Associated with Project:
Owner WALT DISNEY WORLD CO
Permit Applicant IRMGARD BERRY
Type Electrical Fixtures Qty Type
Construcion Types:
Fire Sprinklered?
Cool Roof
Total Fees paid for Permit:
$3,286.00
N/A, ,
No
No
239.15
%WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91
Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit combo
�P��IM Cq
City of - An a 1 {,� 1 e i m 0� ���
Building Divisio 1t
V
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS ' DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION
DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do. not install subfloor or pour floor slab until the follwing applicable items have been
si ned:
Building Final (714 7655153)
Last Inspection-Final Only After Above Completed
Z�
JIII
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sinned offi
Sewer
Water Engineering Backflow (Testable Only)
Water Service