1313 S HARBOR BLVD (453)Permit Types
BLD ELE MEC PLM
X X
Permit Number: BLD2016-00751
Issued: 02/16/2016
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 75
Site Address: 1313 S HARBOR BLVD
Legal Description:
C
(714) 765 - 5153
EIM
Project Description: Demolition of 13,066 sq.ft Building # 9034 "Staff Shop Annex". REF:BLD2015-06770
Number of Stories 1 Valuation:
$35,932.00
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
530.76
People Associated with Project:
Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91
Permit Applicant IRMGARD BERRY
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Sewer Closure
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
City of Anaheim
Building Division
Do not occupy this buildina until the final inspections have been made.
INSPECTION I DATE I INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
not install subfloor or pour floor slab until the follwing
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the foll
have
FINAL INSPECTIONS DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final �1
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153) Z
Last Inspection -Final Only After Above Completed
Building Inspections
PARTIAL INSPECTIONS
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
I Service Meter -(Meter will be set within 2-3
days after approval) Excludes New
!xterior Plaster (Brow
-Bar (Struct., Ele., or
Sewer
Water Engineering Backflow
Water Service
Plumbina Insoections
Electrical Inspections