Loading...
1313 S HARBOR BLVD (468)Permit Types 1n BLD ELE MEC PLM 0 X C9 Permit Number: BLD2016-06046 Issued: 12/22/2016 �r INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 75 Site Address: 1313 S HARBOR BLVD 7101 (Sleeping Beauty Castle) Legal Description: EIM Project Description: Disneyland - Fantasyland - Snow White Grotto - Miscellaneous: Remove and replace existing non - accessible Snow White Grotto bridge, foundation to remain. REF:BLD2016-05317, BLD2016-06040,BLD2016-06041 Valuation: $45,000.00 Construcion Types: NIA, , Fire Sprinklered? No Cool Roof NO Total Fees paid for Permit: 608.28 People Associated with Project: Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91 Permit Applicant STEVE FLENTJE Engineer JEFFEREY CARLILE 2495 CAMPUS DRIVE IRVINE CA 92612 Engineer MARK ERNEST SCHROEDER 16969 VON KARMAN AVE STE 240 IRVINE CA 92606 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo P�PHE1M Cq< Cityof Anaheim o� �o Building Division F z u a A.D�NDED $h� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been s' e • Building Final (714 765-5153) Last Inspection -Final Only After Above Completed I r fl Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been swanedo 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service