Project Description: Disneyland - Back of House Assessment - TDA Parking Lot - Phase 2 Pope House - Tenant
Improvement: 150 sq.ft to add new accessible restroom inside existing building, plumbing, electrical and mechanical. New
electrical water heater to replace existing gas water heater.
Valuation: $100,000.00
Construcion Types: VB,
Occupancy Groups: B, , , ,
Fire Sprinklered? No
Total Fees paid for Permit: 1,052.02
People Associated with Project:
Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P 0 BOX 4741 GLENDALE CA 91
Engineer GREGG MAEDO 3001 REDHILL AVE. BLDG 1 SUITE 222 COSTA MESA CA 92626
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit combo
r
Y
l
EIM
PSI+ C.
City of Anaheim o� t1io
Building Division F i
U r
SOUNDED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sionedi
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
PARTIAL INSPECTIONS
Building Inspections
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Mechanical Inspections
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical (p
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire) 9
Plumbing Inspections
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
'
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Strutt., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service