Loading...
1313 S HARBOR BLVD (474)Permit Types BLD ELE MEC PLM X Permit Number: BLD2016-02158 Issued: 05/03/2016 www.anaheim.net/building (714)765-0626 Quarter Section: 75 CITY OF ANAHEIM Site Address: 1313 S HARBOR BLVD, ANAHEIM;'CA 92802 Legal Description: APN: 08219019 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Project Description: Plumbing to install (1) garbage disposal, (1) repair / alteration of drainage / vent piping, (3) water heaters, water distribution (repipe), (7) floor drains, (1) floor sink, (24) misc.fixtures and (1) sewer- first 10V ft. for Disneyland Back Of house assessment Disney-Boh building 500. REF:BLD2016-00727 Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types: Not Applicable Carport Area: Occupancy Groups: Balcony / Dock Area: Fire Spdnklered: No Cool Root Total Fees paid for Permit: 1,579.07 People Associated with Project: Permit Applicant JOSHUA SCOTT Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE, CA 91222 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Floor Drain 7 Floor Sink 1 Kitchen Sink 1 Miscellaneous Fixture 24 Repair/Drainage AkerationlVent Piping 1 Sewer per 100 ft. 1 Water Distribution 1 Water Heater 3 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PHEIM Cq< City of Anaheim D� io Building Division i U a �D��►DED �ah� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4260 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the foliwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been si 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days atter approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (On not backfill unless smanad afn Sewer Water Engineering Backflow (Testable Only) Water Service