1313 S HARBOR BLVD (487)Permit Types
BLD ELE MEC PLM
X X
Permit Number: BLD2018-02794
Issued: 09/06/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 75
C
Site Address: 1313 S HARBOR BLVD
Legal; Description: -,
200 SM _ AHEIMSI
(714) 765 - 5153
EIM
Project Description: Disneyland - SW - DL Frontierland Expansion - Bldg 10070 - New per -fabricated ship has one stunt
performer only. Anchored to existing pad. Foundation under permit BLD2017-02850
Valuation:
$600,000.00
Construcion Types:
N/A, ,
Occupancy Groups:
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
5.170.51
People Associated with Project:
Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91
Engineer NASSER ALWEHAIDAH 17950 LASSEN ST APT 16 NORTHRIDGE CA 91325
Permit Applicant IRMGARD BERRY
Type Electrical Fixtures
Generators/Transformers - up to 1 hp, up to
1 kva
Receptacle, switches, lights
Theatrical type lighting fixture
Qty Type Plumbing Fixtures Qty Type
2
7
10
Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
d
�leeh�cti
W.
P�PHEIM VU
Cityof Anaheim
Building Division i
DVNDED `gy
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS I DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4260
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures 11
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
sinned:been
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill ijnlpqq qlaned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service