Loading...
1313 S HARBOR BLVD (488)'Permit Types BJ G ELE MEC PLM X Permit Number: BLD2018-04274 Issued: 10/29/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 75 Site Address: 1313 S HARBOR BLVD Legal Description: CI 200 S--ANAHEML (714) 765 - 5153 EIM Project Description: Disney - Christmas Special Hub - Temporary permit: (4) light truss towers and (8) truss arches located by Sleeping Beauty Castle (One day event only November 15th, 2018) Valuation: $10,000.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 1,277,57 People Associated with Project: Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91 Engineer KENNETH E AGEE 3452 E FOOTHILL 626-432-5850 PASADENA CA 91107 Permit Applicant PAYTON BEABER 1313 S. HARBOR BLVD ANAHEIM CA Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo P�pHElnf Cqc Cityof Anaheim o� io Building Division F z u a nroeo Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormsiTrenches (Footings) COAIMigation Measures Do not install subiloor or pour floor slab until the follwing applicable items have been signed: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed F/0546 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Fioor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical, Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construe 'o Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned ofn Sewer Water Engineering Backflow (Testable Only) Water Service