Loading...
1313 S HARBOR BLVD (492)– —��- Permit Types BLD ELE MEC PLM X Permit Number: BLD2017-05736 Issued: 04/06/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 75 Site.;Address:.1313 S HARBOR BLVD Legal'.Description: Ci 200 SMANAAHH. EIIMsBL (714) 765 - 5153 EIM Project Description: Disneyland. - SW - Frontierland - Bldg 9050 / BOH office - Storage Racks: 477 In.ft x 11' high and 216 In.ft 15' high. Valuation: Construcion Types: N/A, , Fire Sprinklered? No Cool Roof NO Total Fees paid for Permit: 1,067.47 People Associated with Project: Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91 Engineer NARESH J PALKHIWALA 1725 S. DOUGLAS RD. ANAHEIM CA 92806 Contractor RAYMOND HANDLING SOLUTIONS INC 9939 NORWALK BLVD SANTA FE SPRINGS CA 90670 0000 Permit Applicant JAMES CHAVEZ Type Electrical Fixtures Qty ' Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit combo P�PNEIM �qc Cityof Anaheim D� o Building Division F y a �DVNDED �6h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed l Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECT11ONS Buildina Inspections .r A& Its. Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders)17 / Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been Mane& 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagatlon Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Constructoo Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service