1313 S HARBOR BLVD 9090cermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2022-05005
Issued: 10/20/2022
www.anaheim.net/building
(714)765-0626
Quarter Section: 75
lei iftlff_1►1_l:14li`il
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(711411765-5153
N '
Site Address: 1313 S HARBOR BLVD 9090, ANAHEIM, CA 92802
Legal Description: S TWP 4 RGE 10 SEC 22 T 4 R 10 SEC 22 FOR OF SEC A ;
APN: 08219019
Project Description: Mechanical to support Disney - BOH/East Chiller Plant - Tenant Improvement
Living Area: Number of Stories: 0 Valuation: 0.00
Garage Area: Construction Types. • WA
Carport Area: Occupancy Groups:
Balcony I Dock Area: Fire Sprinldered: No
Cool Roof: Total Fees paid for Permit: 796.00
People Associated with Project:
Permit Applicant Tyler Truong
Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE, CA 91222
Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Commercial System per 1,000 sq. ft. 1
Miscellaneous Appliance 1
Processing, Special or Hydronic Piping per 2
100 ft.
Ventilation Fan - > 300 ctm on single duct 5
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PHEow �q<
City of Anaheim D� �O
Building Division r i
U >
�DVn+DED day^
Do not occupy this building until the final•insaections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
I
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
-
q-2nd Floor (Floor Nailing)
U/-X I 16 !�
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
N
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
Permit Types
BLD ELE MEC PLM
X
Permit Number. BLD2022-05005
Issued: 10/20/2022
VANw.anaheim.net/building
(714)765.4626
Quarter Section: 75
CITY OF ANAHEIM
BUILDING DMSION
200 S. ANAHEIM BLVD_ .
(714) 166 '515.3.
Site Address: 1313 S HARBOR BLVD 9090, ANAHEIM, CA 92802
Legal Description: S TWP 4 RGE 10 SEC 22 T 4 R 10 SEC 22 POR OF SEC A
APN:08219019
WORKER'S COMPENSATION DECLARATION:
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE•IS UNLAWFUL, AND SHALL. SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES
AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED
FOR IN SECTION 3706 OR THE LABOR CODE. INTEREST, AND ATTORNEY'S FEES. '
I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a certificate of consent to selfdnsure for worker's compensation, issued by the Director of Industrial Rellitions as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
1 have and will maintain worker's compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which
this permit Is issued. My worker's Compensation insurance carder and policy are:
Cartier. NATIONWIDEMUTUAL INSURANCE COMPANY Policy No.: ACPWC3110166057 Expiration Date: 9/1/2023
Name of Agent:. 'I/ 1 LFZ -T 1 W &- Phone No.: -i i g `{ 11•( ` 3 c)O
I certify that in the performance of the work for which this permit is issued, I shall not employ any person In any manner so as to become subject to the
worker's compensation laws of California, and agree that, If I should become subject to the worker's compensation provisions of Section 3700 of the
or " hell th comply with those provisions.
t O ['d0 �o-V -'�
Signature of pldcant Date
DECLARATION REGARDING CONSTRUCTION LENDING AGENCY:
I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is Issued
(Sec.3097.Civ.C):
Lender's Name:
Lender's Address:
LICENSED CONTRACTOR'S DECLARATION:
I hereby affirm under the penalty of Perjury that 1 am licensed under provisions of chapter 9 (commencing with Section 7000) of Division 3 of the Business and
Professions Code, and my license is In full force and effect.
17
101,10 I aGao�1
Contractor nature Date
NUMBER EXPIRATION DATE LICENSE TYPE ISI
291740 06/3112023 B, C-4, C16, C20, C36, A
j Permit Types
BLD ELE MEC PLM
9 X
Penna Number: BLD2022-05005
Issued: 10/20/2022
www.anaheim.rlet/building
(714)765-4626
Quarter Section: 75
CITY OF ANAHEIM
BUILDING DMSION
200 S. ANAHEIM BLVD.
(714) 765-5153
Site Address: 1.313 S HARBOR BLVD 9090, ANAHEIM, CA 92802
Legal Destirlptitin: S:TWP 4 RGE:10 SEC 22 T 4 R 10 SEC 22 POR OF SEC A
APN: b82190119
Project Description: Mechanical to support Disney - BOH/East Chiller Plant - Tenant Improvement
Living Area: Number of Stories: 0 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups.
Balcony I Dock Area: Fire Spdnldered: No
Cool Roof Total Fees paid for Permit: 796.00
People Associated with Project:
Permit Applicant Tyler Truong
Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P 0 BOX 4741 GLENDALE, CA 91222
Type Electrical Fixtures Qly Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Commercial System per 1,000 sq. ft. 1
Miscellaneous Appliance 1
Processing, Special or Hydronic Piping per 2
11001
Ventilation Fan - > 300 ch on single duct 5
0
The permit shall expire by limitation and become null and void If the building or worts has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue worts.
P�PHEIM �qC
Cityof Anaheim o� �O
Building DivisionF �'y
u >
OU�►DED `gy
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been e
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Ins ections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
0
,1; -- M 1'1C
.c
Moy A 2023
ONWOFAMholm
Maeodwm Bhd awb 1a:
ch o
blenrylond Resort Bulldlna - Past Chiller NO Chiller 4 Rnplacament
• Permit number (BLDZ0ZZ�005)
• Pr4sot addMM (1313 a. Harbor Blvd. 9090. Anaheim, CA =02)
Our Modwowwro
b Behead Rabbadeh am the ualnm of mW Ibrabon olhronoed pfo)oa I hm vMled the elle and
pe A --Md the bMd Orton of Me dMor 4 and No p"W I Wft w a~ 90
The pW Is =npMW and NOW In acwftnca vNh tit applovad Pian.
Si mmly yours.
&.fit
San RoWft ah/ CEO
MEDS InUmdonal Inc
401 Oaw111at Aaiena.. •+a NCO . G�tu1o�*. G ND•O1 VS.- 018-"19-144M. PAN: SIB-"W-1AMR . W M.1410"NNINORM.0oM
March 29, 2023
City Of Anaheim
200 S Anaheim Blvd Suite 162
Anaheim, CA 82805
Subject: Disneyland Resort Building — East Chiller Plant Chiller 4 Replacement
Dear MadamelSlr;
I, Behzad Rabizadeh, am the engineer of record for above referenced project. I have visited the site and
reviewed the Installation of the chiller 4 and its piping. I hereby acknowledge that:
The project is progressed and installed in accordance with the approved Plan, and
ready for start up.
Sincerely yours,
r
Ben Rabizadeh, CEO
MEDG International Inc