Loading...
1515 S HARBOR BLVD (351)Penn _Wr Permit Number: BLD2016-01036 _11 Issued: 02/29/2016 CI OFA= ' H EI M INSPECTION REQUEST LINE: BUD NG Dl.' I ION N (714) 765 - 4626 200 SI VD. Quarter Section: 76 (714) 765 - 5153 `°°ASi�ega�te A�dddiress: 1515 S HARBOR BLVD 304 HYPERION THEATRE .,VD-escription: Projetat Description: Tenant Improvement: Installation of bracings at proscenium arch for "DCA-Hyperian Theatre" Valuation: $45,000.00 Construcion Types: IIA, , Fire Sprinklered? Yes Cool Roof No Total Fees paid for Permit: 878.48 People Associated with Project: Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit combo S�PF1EI/W Cq< Cityof Anaheim O� eco Building Division F i >, �OVNLD) ED �$y^ Do not occupy this buildina until the final. inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListfBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ned: Building Final (714 765.5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been si ned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor unless(Do not backfill Sewer ' Water Engineering Backflow (Testable Only) Water Service 11�