Loading...
1515 S HARBOR BLVD (366)Permit Types BLD ELE MEC PLM X Permit Number: BLD2018-01502 Issued: 05/24/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 76 C Site Address: 1515 S HARBOR BLVD 202 (WEST MAIN ENTRANCE COMPLEX) Legal ' Description: 200 SMIANAHEIMsBLVD. (714) 765 - 5153 EIM Project Description: DCA - Buena Vista West Block Roof Fall Protection - Tenant Improvement: New steel guardrail, steel ladder with papapet crossover platform, security gates all located on roof. Valuation: $98,000.00 Construcion Types: NIA, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 1,644.90 People Associated with Project: Owner WALT DISNEY WORLD CO P O BOX 4741 %TAX DEPT GLENDALE CA 91222-0741 Engineer KENNETH E AGEE 3452 E FOOTHILL 626-432-5850 PASADENA CA 91107 Permit Applicant GIOVANNY RIVERA Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo P�p.HEIM �q< Cityof Anaheim D� io Building Division a U D Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ed• Building Final (714 765-5153)v Last Inspection-Final Only After Above Completed (> Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (CompactI&Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sffianeds 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out). •.„ Rough Duct (Mechanical) ` '` `•�+, Rough Mechanical '� •• , Rough Electrical t Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hack nless sinned off) Sewer Water Engineering Backflow, (Testable Only) Water Service