1526 W HARLE PL (2)Permit Types
BLD ELE MEC PLM
X I X X X
Permit Number: BLD2016-00902
Issued: 02/19/2016
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 57
Site Address:1526 W HARLE PL
Legal, Description: N TR 2446 LOT 20
C
200 SiANAHEIM,BL
(714) 765 - 5153
EIM
Project Description: Residential Remodel: Remove and replace (8) retro -fit windows and (1) slider. Interior remodel of (2)
bathrooms and kitchen with mechanical, electrical, and plumbing throughout. Install 480 sq.ft. of drywall in garage.
People Associated with Project:
Owner MARY ELYN KRUTCIK TR 1526 HARLE PL ANAHEIM CA 92802-2510
Permit Applicant MYONG YI
Contractor CAL BEST CONSULTATION INC, : » ° 1327 N CHAPMAN AVE FULLERTON CA 92833 0000
li •
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty
Receptacle, switches, lights 50 Bath Tub' 1
Shower 1
Lavatory 2
Water Closet 2
Kitchen Sink 1
Garbage Disposal 1
Repair/Drainage Alteration/Vent Piping 1
Dishwasher 1
Type Mechanical Fixtures Qty
Ventilation Fan - — 300 cfm on single duct 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
Valuation:
$30,000.00
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
1,221,23
People Associated with Project:
Owner MARY ELYN KRUTCIK TR 1526 HARLE PL ANAHEIM CA 92802-2510
Permit Applicant MYONG YI
Contractor CAL BEST CONSULTATION INC, : » ° 1327 N CHAPMAN AVE FULLERTON CA 92833 0000
li •
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty
Receptacle, switches, lights 50 Bath Tub' 1
Shower 1
Lavatory 2
Water Closet 2
Kitchen Sink 1
Garbage Disposal 1
Repair/Drainage Alteration/Vent Piping 1
Dishwasher 1
Type Mechanical Fixtures Qty
Ventilation Fan - — 300 cfm on single duct 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
HEIM`
City of Anaheim ����- `��
�!.co�
Building Division /F;- ;Z.
�l 'D
ovN�E a,
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4260
Engineering Final (714) 765-5126
INSPECTION
DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ned•
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
['� (^'P,�L INSPECTIONS
Building In spe l f v' EXPIRED
C., '`/`/ I R E p
+ (` Q p n -r I n r, .
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
,
AInT 04
Underfloor Insulation (Raised Foundation Only)
Opp
IVV (j MR
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
ATE: !�_
Do not cover or conceal the work below until the following applicable items have
been
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
7]z&h6 jAwou)%4
Rough Duct (Mechanical)
,
Rough Mechanical
Rough Electrical]
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Insoections
I
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless smaned offi
Sewer
Water Engineering Backflow (Testable Only)
Water Service
'