Loading...
1526 W HARLE PL (2)Permit Types BLD ELE MEC PLM X I X X X Permit Number: BLD2016-00902 Issued: 02/19/2016 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 57 Site Address:1526 W HARLE PL Legal, Description: N TR 2446 LOT 20 C 200 SiANAHEIM,BL (714) 765 - 5153 EIM Project Description: Residential Remodel: Remove and replace (8) retro -fit windows and (1) slider. Interior remodel of (2) bathrooms and kitchen with mechanical, electrical, and plumbing throughout. Install 480 sq.ft. of drywall in garage. People Associated with Project: Owner MARY ELYN KRUTCIK TR 1526 HARLE PL ANAHEIM CA 92802-2510 Permit Applicant MYONG YI Contractor CAL BEST CONSULTATION INC, : » ° 1327 N CHAPMAN AVE FULLERTON CA 92833 0000 li • Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Receptacle, switches, lights 50 Bath Tub' 1 Shower 1 Lavatory 2 Water Closet 2 Kitchen Sink 1 Garbage Disposal 1 Repair/Drainage Alteration/Vent Piping 1 Dishwasher 1 Type Mechanical Fixtures Qty Ventilation Fan - — 300 cfm on single duct 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo Valuation: $30,000.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 1,221,23 People Associated with Project: Owner MARY ELYN KRUTCIK TR 1526 HARLE PL ANAHEIM CA 92802-2510 Permit Applicant MYONG YI Contractor CAL BEST CONSULTATION INC, : » ° 1327 N CHAPMAN AVE FULLERTON CA 92833 0000 li • Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Receptacle, switches, lights 50 Bath Tub' 1 Shower 1 Lavatory 2 Water Closet 2 Kitchen Sink 1 Garbage Disposal 1 Repair/Drainage Alteration/Vent Piping 1 Dishwasher 1 Type Mechanical Fixtures Qty Ventilation Fan - — 300 cfm on single duct 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo HEIM` City of Anaheim ����- `�� �!.co� Building Division /F;- ;Z. �l 'D ovN�E a, Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4260 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ned• Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas ['� (^'P,�L INSPECTIONS Building In spe l f v' EXPIRED C., '`/`/ I R E p + (` Q p n -r I n r, . Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) , AInT 04 Underfloor Insulation (Raised Foundation Only) Opp IVV (j MR Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) ATE: !�_ Do not cover or conceal the work below until the following applicable items have been 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) 7]z&h6 jAwou)%4 Rough Duct (Mechanical) , Rough Mechanical Rough Electrical] Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Insoections I Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor (Do not backfill unless smaned offi Sewer Water Engineering Backflow (Testable Only) Water Service '