2104 W HARRIET LN (5)Permit Types JAI 1 Al C.
BLD I ELE- MEC PLM pa - ,t,
X X p
Permit Number: BLD2016-05619
Issued: 11/21/2016 CIEIM
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 42
Site Address: 2104 W HARRIET LN
Legal,D`e"scriptioii: N'TR 6089.LOT 17
200 SMANAHEIMMLVD.
(714) 765 - 5153
Project Description: Photovoltaic System: Install residential roof mounted solar system with 11 moduels, and 125 amp
sub -panel. -
Valuation:
$7,000.00
Construcion Types:
NIA, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
797.56
People Associated with Project:
Owner MELODY HU 2104 W HARRIET LN ANAHEIM CA 92804-6040
Contractor SOLARCITY CORPORATION 1831 S. RITCHEY AVE SANTA ANA CA 92705
Permit Applicant MELISSA FOXX
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Sub Panel/Temp Pwr - < 600 V, 0 < amps 1
<= 200
Generators/Transformers -1 to 10 hp, 1 to 1
75 kva
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION I DATE I INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
sionedi
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s' e •
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
FINAL INSPECTIONS I DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765.4591
Sub List/Bus. Lic. (714) 7654194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
3/4,
y�
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections