Loading...
2201 S HARBOR BLVD (8)Permit Types BLD ELE MEC PLM X Permit Number: BLD2016-00174 Issued: 01/13/2016 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 78 Site -Address: 2201 S HARBOR BLVD Legal Description: TR 5688 LOT 1 E 200 FT -EX S 70 FT - C (714) 765 - 5153 Project Description: Reroof: Remove and replace 23 squares of built up roof, resheath as necessary. People Associated with Project: EIM valuation: $8,000.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 279.70 Owner ARIF SIDDIQ 1206 N HARBOR BLVD SANTA ANA CA 92703-1609 Permit Applicant KEVIN VAZQUEZ Contractor CERTIFIED ROOFING SPECIALISTS 9281 LARKSPUR DR WESTMINSTER CA 92683 0000 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit_combo PNPHEIM �q< City of Anaheim k1 Building Division i 1U ' �OU'V0E $y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4260 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Building Final (714 7655153) Last Inspection-Final Only After Above Completed q 1��/ X6 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' ed• 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Flo RoS heath ragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New C nstruc 'o Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor (Do not backfill unless swoned offi Sewer Water Engineering Backflow (Testable Only) Water Service