Loading...
5360 E HONEYWOOD LN (5)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-02348 Issued: 05/25/2023 www.anaheim.net/building (714)7654626 Quarter Section: 180 CITY OF ANAHEIM Site Address: 5360 E HONEYWOOD LN, Anaheim, CA 92807 Legal Description: N TR 8783 BLK LOT 9 APN:36323401 Project Description: Residential EV Charger Level 2 LMng Area: Number of Stories: Garage Area: Carport Area: Balcony / Deck Area: Cool Roof: BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Valuation: 0.00 Construction Types: Occupancy Groups: Fire Spdnidered: Total Fees paid for Permit: 0.00 People Associated with Project: Contractor OC ELECTRIC 17052 CARLANN CIR APT A TUSTIN, CA Permit Applicant Ruben Padilla 17052 Carlann Cir Apt A Tustin, CA 92780 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PNEIM �.q< Cityof Anaheim o� io Building Division F i a DED �ay� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) ' COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinnedi Building Final (714 765-5153) Last Inspection -Final Only After Above Completed . L Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sionedp 1st Floor Shear Firesprinkler.(Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service