7531 E HOLLOW OAK RD (2)Permit Types
bib ELE MEC PLM CITY OF ANAHEIM
X
BUILDING DIVISION
Permit Number: BLD2023-02915 200 S. ANAHEIM BLVD.
Issued: 06/12/2023 (7141765 -5153
www.anaheim.net/building
(714)765.4626
Quarter Section: 209
Site Address: 7531 E HOLLOW OAK RD, ANAHEIM, CA 92808
Legal Description: N TR 12688 BLK LOT 3
APN:35451103
Project Description: Residential EV Charger
Living Area: Number of Stories: 1 Valuation: 0.00
Garage Area: Construction Types: N/A
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spdnidered:
CoolRoof Total Fess paid for Permit: 167.00
People Associated with Project:
Owner DIN, SALAH UD TR THE DIN 7531 E HOLLOW OAK RD
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
EV Charger 1
The permit shall expire by limitation and become null and void It the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION I DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the foliwing applicable items have been
sionedo
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinfJBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fin:)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Constructi
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
FINAL INSPECTIONS DATE I INSPECT!?11
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections