7601 E HOLLOW OAK RD (2)Pem►it Types
Bi BELE MEC PLM
X
Permit'Number: OLD2023-03095
Issued: 06/22/2023
www.anaheim.net/building
(714)765-0626
Quarter Section: 215
CITY OF ANAHEIM
Site Address: 7601 E HOLLOW OAK RD, ANAHEIM, CA 92808
Legal Description: N TR 12688 BLK LOT 63
APN:35451201
Project Description: Residential EV Charger Level 2
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Living Area: Number of Stories: Valuatlon: 0.00
Garage Area: Construction Types:
Carport Area, Occupancy Groups:
Balcony I Deck Area: Fire Sprinidered:
Cool Roof: Total Fees paid for Permit: 0.00
People Associated with Project:
Contractor JVEC INC 2729 SATURN ST UNIT A202101211651106304 BREA, CA 92821
Permit Applicant Jack Vardiman
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�PHEIM Cq�
Cityof Anaheim o� io
Building Division
>
OECD)
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INS"r ECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final �fL3Y'y(
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
slane .
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildina Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s*aned7
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
ruction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service