Loading...
8796 E HEATHERWOOD RDPermit Tgtias 'uw•' ELEMEC PLM X Permit Number: BLD2023-03115 Issued: 06/22/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 233 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765 -5153 Site Address: 8796 E HEATHERWOOD RD, ANAHEIM, CA 92808 Legal Description: N TR 15072 BLK LOT 2 LIN 29 TRACT 15072, LOT 2 OF P APN: 93839078 Project Description: Residential EV Charger Level 2 Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinldered: Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Owner SRIPADA, RAJ 8 SIRISHA 8796 E HEATHERWOOD RD Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void It the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. I.. P�PNEIM Cq< Cityof Anaheim o� io Building Division F i U > �OGNOFV Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS `SATE IR areCTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 7-0ify-zi, Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the foliwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s*aneds 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service