Loading...
403 S INDIANA ST (2)Permit Types BLD ELE MEC PLM X Permit Number. 13LD2022-05626 Issued: 11/28/2022 www.anaheim.net/building (714)765.4626 Quarter Section: 63 SIb,Address: 403 S INDIANA ST, ANAHEIM, CA 92805 Le. pal:LDisci'lptlon: N TR 351 BLK B LOT 18 A.PNs 03612229 CITY OF ANAHEIM BUILDING DIVISION "0 S. ANAHEIM BLVD. (7141765.5153 t 1 t Project Description: Plumbing to Replace water main and repipe with copper Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: N/A CarportArea: Occupanq Groups: Balcony I Deck Area: Fire SprinMered: Cool Root. Total Fess paid for Permit: 167.00 People Associated with Project: _ Owner RIVERS STEPHEN MARK 403 S INDIANA ST Type • --- • • Electrical Fixtures Qty Type Plumbing Fixtures— — _ - Qty Mechanical Fixtures Qly= Water Distribution 1 -` Water Main per 100 ft. The permit shall expire by Ilmitatlon and become null and void If the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. P�pHElm Cqt City of Anaheim D� �o Building Division F y u D �DG�►DED �$y� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Ele al Final lu ng Final D CQ Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned7 Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sionede 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame)-- - - Masonry (Reinf./Bond Beam/Pre-Grout) ogg umbmg (Top Ou Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service