Loading...
413 N JANSS ST (5)p Permit Types BLD ELE MEC PLM X Permit Number: BLD2016-03218 Issued: INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 72 Site Address: 413 N JANSS ST Legal Description: N TR 423 BLK C LOT 1 CI (714) 765 - 5153 EIM Project Description: Reroof: Remove the existing material, resheath and install 33 squares with composition shingles over house and detached garage; 6 squares of rolled roofing over patio. Valuation: $15,000.00 Construcion Types: NIA, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 293.50 People Associated with Project: Owner CHRISTOPHER VILLATORO 413 N JANSS ST ANAHEIM CA 92805-2528 Permit Applicant CHRISTOPHER VILLATORO Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit_combo , I ( I r`t ..., 11�IJ►_.l`� • r�1 '� .r.��t' 2- rji t y ��P14EIM CqC Cityof Anaheim D� Jo Building Division i U ' a SOUNDED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ne • Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) PARTIAL INSPECTIONS Building Inspections )%#00!j Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) dim 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sunned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Mechanical Inspecti n Ni C I .... R F n T I r) • i Roof (Sheathing/Diaphragm/Frame) 1- Masonry (Reinf./Bond Beam/Pre-Grout) j Rough Plumbing (Top Out) Rough Duct (Mechanical) . 2-1 Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Plumbing Inspections Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor ss sinned ofl) Sewer Water Engineering Backflow (Testable Only) Water Service