413 N JANSS ST (5)p
Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2016-03218
Issued:
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 72
Site Address: 413 N JANSS ST
Legal Description: N TR 423 BLK C LOT 1
CI
(714) 765 - 5153
EIM
Project Description: Reroof: Remove the existing material, resheath and install 33 squares with composition shingles over
house and detached garage; 6 squares of rolled roofing over patio.
Valuation:
$15,000.00
Construcion Types:
NIA, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
293.50
People Associated with Project:
Owner CHRISTOPHER VILLATORO 413 N JANSS ST ANAHEIM CA 92805-2528
Permit Applicant CHRISTOPHER VILLATORO
Type Electrical Fixtures Qty Type
Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbid_permit_combo
, I ( I r`t
..., 11�IJ►_.l`�
• r�1 '� .r.��t'
2- rji
t y
��P14EIM CqC
Cityof Anaheim D� Jo
Building Division i
U '
a
SOUNDED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ne •
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
PARTIAL INSPECTIONS
Building Inspections
)%#00!j
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
dim
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sunned7
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Mechanical Inspecti n
Ni
C
I ....
R F n T I r) • i
Roof (Sheathing/Diaphragm/Frame) 1-
Masonry (Reinf./Bond Beam/Pre-Grout)
j
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
. 2-1
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Plumbing Inspections
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
ss sinned ofl)
Sewer
Water Engineering Backflow (Testable Only)
Water Service