Loading...
501 E JULIANNA STPermit Types BLD ELE MEC PLM X Permit Number: BLD2023-01481 Issued: 04/11/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 81 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765.5153 Site Address: 501 E JULIANNA ST, ANAHEIM, CA 92801 Legal Description: S TWP 4'RGE 10 SEC 3 SEC 3 T 4 R 10 POR W1/2 SEI/4 APN:03502055 Project Description: Miscellaneous: Remove in -ground sand oil separator. Living Area: Number of Stories: 0 Valuation: 5,000.00 Garage Area: Construction Types: WA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 173.40 People Associated with Project: Permit Applicant George Mindereann 2286 STONE BLVD SACRAMENTO, CA 95691 Owner NOR -CAL BEVERAGE CO INC 2286 STONE BLVD Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or contlnue work. P�PNEIM Cqt City of Anaheim o� io Building Division U > �Dvn+DED �$h� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fin; Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 100 , Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hackfill unless sinned ofn Sewer Water Engineering Backflow (Testable Only) Water Service