Address: 712 N JANSS ST
Residential Site Plan
Zone: Rs -2
Planning Services Division
APPROVED
r ! ��ee An
BY: 1�1;Q4,J0 AnC6 ( r )
�
DATE: 10/09/15
Description/Notes:
OK for new AC change -out in side yard, 5 feet
from property line.
Plans comply with Title 18 of the A.M.C. (Zoning).
Plan Review Fee Required $ OTC
Required
Proposed
Front
Setback
Side
Setback
Rear
Setback
Max. Lot
Coverage
Max.
Bldg
STATE OF CALIFORNIAI.�ZL1S#D; S'U i •
,ALTERATIONS - HVAC
CtC-CF1R-ALT-04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CF1R-ALT-04-E
Alterations - HVAC CZ 2, and 8-15 (formerly CF -1R -ALT -HVAC) ,F�{b q '! 5 +r (Page 1 of 1)
Site Add si /N��
E rcemen Agency:
Date P epar d:
Permit#:
V
.0 s"
Equipment Type
Equipment Efficiency
New Ducting, Plenums, Lineset:
Co itio ed
Thermostat
Required R -value
Floor Area (sq ft)
❑ P aged System ❑� �Env Aerator Coil
'IffSplit System 0 Condensing Unit
O —AFUE
COP
❑ R-6 -(CZ 2, 8-13J Ducting
Served by s stem
❑ setback
❑ M' Mplit ❑ Compressor
j
JY'
❑ R-8' (CZ 11,14,15) Ducting
/sgft
(If not already
SEER
HSPFpresent,
❑ R-6 (all CZs) Plenums
must
Furnace ❑Lineset
13R-5 or R7.5) Uneset
be installed)
❑ TXV
HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below. At permit application this
for lowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site.
1. HVAC Changeout/Repair
Required Compliance Documents to be left on site for Final:
All Equipment,
CF1R-ALT-02-E
Condenser Unit, Evaporator Coil,
CF2R: MECH-03, MECH-20-HERS, MECH-(23 or 24)2 -HERS, MECH-25-HERS2
Compressor, TXV, Uneset,
CF3R: MECH-20-HERS, MECH-(23 or 24)-HERS2, MECH-25-HERS2
Air Handler/Furnace2 (Can include new ducting)
Installer Requirement: Duct leakage (< 15960, or < 10% to outside, or seal all accessible leaks), Air Flow >_ 300 CFM/ton, Refrigerant Charge.
Exempted from duct leakage testing if:
❑ 1. Duct system registered with HERS provider as previously sealed, or 132. There is less than 40 linear feet of duft in unconditioned space, or
133. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building
❑ 2. New HVAC System
Required Compliance Documents to be left on site for Final:
All new equipment and All New DuCtS3
CF1R-ALT-02-E
including Mini Split
CF2R: MECH-01, MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS2, MECH-25-HERS2
CF3R: MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS2, MECH `25-HEAS2
Mini Splits require CF111-ALT-02-E, CF2R-MECH-01, and (CF2R-CF3R) MECH-25-HERS
Inst r Requirement: Duct leakage -:S 6%, Fan Efficacy (.58W/CFM), Air Flow >_ 350 CFM/ton (or alternative), Refrigerant Charge
3. All New Ducts with Replacement
Required Compliance Documents to be left on site for Final:
All New Ducts' and one or more of the following
CF1R-ALT-02-E '
replaced: Condenser Unit, Evaporator Coil,
CF2R: MECH-01, MECH-20-HERS, MECH-(23 or 24) -HERS, MECH-25-HERS
Compressor, TXV, Lineset, Fu*rnace2
CF3R: MECH-20-HERS, MECH-(23 or 24) -HERS, MECH-25-HERS
Installer Requirement: Duct leakage < 6%, Air Flow >_ 350 CFM/ton (or alternative), Refrigerant Charge
Exempted from duct leakage testing if. ❑ 1. Existing duct systems are constructed, insulated or sealed with asbestos
❑ 4. New Ducting over 40 feet I Required Compliance Documents to be left on site for Final:
New ducting but less than All New Ducts' I CFiR-ALT-02-E,'CF2R: MECH-20-HERS, CF3R: MECH-20-HERS
Installer Required to: Duct leakage (:S.15% dr,:L10% 30% to outside or, or seal all accessible leaks)
❑ EXCEPTION: Existing duct systems constructed, insulated or sealed with asbestos.
' All new ducting R-8 required when more than 40 ft installed and R-6 when less than 40 ft installed. This includes in walls, between floors etc.
2 Heating only systems and Air Handler/Furnace changes do not require Air Flow MECH-(23 or 24), or Refrigerant Charge verification MECH-25
a All New Ducts is when at least 75 percent of the duct system is new duct material, and up to 25 percent may consist of reused parts from the
dwelling existing duct system (e.g., registers, boots, handier, duct -
unit's grilles, air coil, plenums, material)
° R-5 (1" thick insulation) for linesets 1" and less. R-7.5 (1.5" thick insulation) for linesets over 1 inch. Most mfg will require Suction line Diameter
with insulation as the following 1.5-27 25/e", 2.5 -3T -2W, 3.5 to 4T-2ia", 5T-4%0
Contractor (Documentation Author's /Responsible Designer's Declaration Statement)
I certify the following under penalty'of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document.
3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the
Title 24, Parts 1 6 the California Code Regulations
requirements of and of of (CCR).
4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or
system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the CCR.
5. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application. '
Respon ible Designer Named
Responsible 0 g � S gnature:
Date signed:
license:
C any :
6> oal-tom •zit t��s�
Address:
3 G �
City/State/W
'*'V � S e
Phone:
7'