Loading...
712 N JANSS ST (4)'�c coy d frf oY i PERMIT EXPIRED .INSPECTIO NOT COMPLETE gtJ- g ii! DATE: I q2 Address: 712 N JANSS ST Residential Site Plan Zone: Rs -2 Planning Services Division APPROVED r ! ��ee An BY: 1�1;Q4,J0 AnC6 ( r ) � DATE: 10/09/15 Description/Notes: OK for new AC change -out in side yard, 5 feet from property line. Plans comply with Title 18 of the A.M.C. (Zoning). Plan Review Fee Required $ OTC Required Proposed Front Setback Side Setback Rear Setback Max. Lot Coverage Max. Bldg STATE OF CALIFORNIAI.�ZL1S#D; S'U i • ,ALTERATIONS - HVAC CtC-CF1R-ALT-04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CF1R-ALT-04-E Alterations - HVAC CZ 2, and 8-15 (formerly CF -1R -ALT -HVAC) ,F�{b q '! 5 +r (Page 1 of 1) Site Add si /N�� E rcemen Agency: Date P epar d: Permit#: V .0 s" Equipment Type Equipment Efficiency New Ducting, Plenums, Lineset: Co itio ed Thermostat Required R -value Floor Area (sq ft) ❑ P aged System ❑� �Env Aerator Coil 'IffSplit System 0 Condensing Unit O —AFUE COP ❑ R-6 -(CZ 2, 8-13J Ducting Served by s stem ❑ setback ❑ M' Mplit ❑ Compressor j JY' ❑ R-8' (CZ 11,14,15) Ducting /sgft (If not already SEER HSPFpresent, ❑ R-6 (all CZs) Plenums must Furnace ❑Lineset 13R-5 or R7.5) Uneset be installed) ❑ TXV HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below. At permit application this for lowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site. 1. HVAC Changeout/Repair Required Compliance Documents to be left on site for Final: All Equipment, CF1R-ALT-02-E Condenser Unit, Evaporator Coil, CF2R: MECH-03, MECH-20-HERS, MECH-(23 or 24)2 -HERS, MECH-25-HERS2 Compressor, TXV, Uneset, CF3R: MECH-20-HERS, MECH-(23 or 24)-HERS2, MECH-25-HERS2 Air Handler/Furnace2 (Can include new ducting) Installer Requirement: Duct leakage (< 15960, or < 10% to outside, or seal all accessible leaks), Air Flow >_ 300 CFM/ton, Refrigerant Charge. Exempted from duct leakage testing if: ❑ 1. Duct system registered with HERS provider as previously sealed, or 132. There is less than 40 linear feet of duft in unconditioned space, or 133. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building ❑ 2. New HVAC System Required Compliance Documents to be left on site for Final: All new equipment and All New DuCtS3 CF1R-ALT-02-E including Mini Split CF2R: MECH-01, MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS2, MECH-25-HERS2 CF3R: MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS2, MECH `25-HEAS2 Mini Splits require CF111-ALT-02-E, CF2R-MECH-01, and (CF2R-CF3R) MECH-25-HERS Inst r Requirement: Duct leakage -:S 6%, Fan Efficacy (.58W/CFM), Air Flow >_ 350 CFM/ton (or alternative), Refrigerant Charge 3. All New Ducts with Replacement Required Compliance Documents to be left on site for Final: All New Ducts' and one or more of the following CF1R-ALT-02-E ' replaced: Condenser Unit, Evaporator Coil, CF2R: MECH-01, MECH-20-HERS, MECH-(23 or 24) -HERS, MECH-25-HERS Compressor, TXV, Lineset, Fu*rnace2 CF3R: MECH-20-HERS, MECH-(23 or 24) -HERS, MECH-25-HERS Installer Requirement: Duct leakage < 6%, Air Flow >_ 350 CFM/ton (or alternative), Refrigerant Charge Exempted from duct leakage testing if. ❑ 1. Existing duct systems are constructed, insulated or sealed with asbestos ❑ 4. New Ducting over 40 feet I Required Compliance Documents to be left on site for Final: New ducting but less than All New Ducts' I CFiR-ALT-02-E,'CF2R: MECH-20-HERS, CF3R: MECH-20-HERS Installer Required to: Duct leakage (:S.15% dr,:L10% 30% to outside or, or seal all accessible leaks) ❑ EXCEPTION: Existing duct systems constructed, insulated or sealed with asbestos. ' All new ducting R-8 required when more than 40 ft installed and R-6 when less than 40 ft installed. This includes in walls, between floors etc. 2 Heating only systems and Air Handler/Furnace changes do not require Air Flow MECH-(23 or 24), or Refrigerant Charge verification MECH-25 a All New Ducts is when at least 75 percent of the duct system is new duct material, and up to 25 percent may consist of reused parts from the dwelling existing duct system (e.g., registers, boots, handier, duct - unit's grilles, air coil, plenums, material) ° R-5 (1" thick insulation) for linesets 1" and less. R-7.5 (1.5" thick insulation) for linesets over 1 inch. Most mfg will require Suction line Diameter with insulation as the following 1.5-27 25/e", 2.5 -3T -2W, 3.5 to 4T-2ia", 5T-4%0 Contractor (Documentation Author's /Responsible Designer's Declaration Statement) I certify the following under penalty'of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document. 3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the Title 24, Parts 1 6 the California Code Regulations requirements of and of of (CCR). 4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the CCR. 5. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. ' Respon ible Designer Named Responsible 0 g � S gnature: Date signed: license: C any : 6> oal-tom •zit t��s� Address: 3 G � City/State/W '*'V � S e Phone: 7'