755 N JANSS ST (2)Permit Types
BLD ELE MEC PLM
X I X X X
Permit Number: BLD2016-01952
Issued: 04/20/2016
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 61
Site Address: 755 N JANSS ST
Legal Description: N TR 1493 LOT 2
C
200 Si�AVAHEIMSL
(714) 765 - 5153
EIM
Project Description: Residential Remodel: Kitchen and bathroom remodel to install tile at shower area with electrical
mechanical and plumbing.
Valuation:
$14,000.00
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
572.06
People Associated with Project:
Owner AARON H BENDIX 755 N JANSS ST ANAHIEM CA 92805-2569
Contractor K M D CONSTRUCTION INC 5641 AMBERDALE DR YORBA LINDA CA 92886
Permit Applicant MICHAEL DIXON
{ i l i 1
Type ElectricatFixtures '' Qty ' Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Receptacle, switches, lights, • j 1 ; J + ' ;40! "Shower 1 Ventilation Fan - — 300 cfm on single duct 2
f Lavatory 1
4 Water Closet 1
e • Kitchen Sink 1
t •', �."Vyr •1 Garbage Disposal 1
•""-'" ` �.e - `
Repair/ rain Alteration/Vent Piping 1
Dishwasher 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
City of Anaheim P�PHEIM CqC
O� �o
Building Division F i
u '
�DUNDED �8y^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION F DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the folWng applicable items have been
sinneds
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildin Ins',
ANN -EXPIRED
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)5r
C 0 Al
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
_ _
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
E.
W
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Rough Plumbing (Top Out) Or _
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath°
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Strutt., Ele., or Mec.)
Grease Interceptor
(Do not backfill tjnlpsq -waned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service