Loading...
2012 S JANETTE LN (7)t Permit Types BLD ELE MEC PLM CITY OF ANAHEIM X BUILDING DIVISION Permit Number: BLD2023-01466 200 S. ANAHEIM BLVD. Issued: 03/28/2023 (714)765 -5153 www.anaheim.net/building (714)765.4626 Quarter Section: 67 r Site Address: 2012 S JANETTE LN, ANAHEIM, CA 92802 Legal Description: N TR 2575 BLK LOT 131 APN:09054603 Project Description: Mechanical to replace air conditioner, coil and furnace in attic. Living Area: Nurser of Stories: 0 Valuation: 0.00 Garage Area: construction Types: NIA Carpon Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinldered: Cool Root: Total Fess paid for Permit: 216.00 People Associated with Project: Contractor RIZZO HEATING & AIR CONDITIONING 32823 TIZNOW201603230825240161 MENIFEE, CA 92595 Permit Applicant Roxanne MEasley Owner CASTRO YAUTENZI 2012 S JANETTE LN Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Evaporative or Air Cooled Condenser 1 Heating Appliances, including vent 1 ig Coil 1 m the City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been si e Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been smanada 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service A t FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) COAIMigation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections