2012 S JANETTE LN (7)t
Permit Types
BLD ELE MEC PLM CITY OF ANAHEIM
X
BUILDING DIVISION
Permit Number: BLD2023-01466 200 S. ANAHEIM BLVD.
Issued: 03/28/2023 (714)765 -5153
www.anaheim.net/building
(714)765.4626
Quarter Section: 67
r Site Address: 2012 S JANETTE LN, ANAHEIM, CA 92802
Legal Description: N TR 2575 BLK LOT 131
APN:09054603
Project Description: Mechanical to replace air conditioner, coil and furnace in attic.
Living Area: Nurser of Stories: 0 Valuation: 0.00
Garage Area: construction Types: NIA
Carpon Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinldered:
Cool Root: Total Fess paid for Permit: 216.00
People Associated with Project:
Contractor RIZZO HEATING & AIR CONDITIONING 32823 TIZNOW201603230825240161 MENIFEE, CA 92595
Permit Applicant Roxanne MEasley
Owner CASTRO YAUTENZI 2012 S JANETTE LN
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Evaporative or Air Cooled Condenser 1
Heating Appliances, including vent 1
ig Coil 1
m the
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
si e
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been smanada
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
A
t
FINAL INSPECTIONS I DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
COAIMigation Measures
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections